CONTAINER RAIL TERMINAL (CRT)
1. Conditions
a. Operation and handling of conventional trains will be given preference over container trains.
b. All Private Container Operators (PCO) will have access to any container rail terminal on “first come first serve basis.”
c. Use of ground at a container Rail terminal (CRT) will be permitted to only one private container operator at a time
d. No CRT will provide storage facilities.
e. All CRT will function round the clock.
2. PCO will be responsible for security of cargo awaiting loading and removal.
3. Terminal Access Charge:
i. Per rake per terminal- ₹. 132860/-
ii. If both terminals of Railway- ₹. 265920/-
4. Free time for loading/unloading- 09 Hr.
5. Detention charge- ₹.150/- per rake per hour or part thereof, if rake detained after free time.
6. Ground usage Charge:
a) Ground usage charge will be levied for the use of ground at CRT after expiry of free time.
b) Free time and usage charge.
c) Advance stacking at any CRT is permitted free for 24 hour.
7. Development Surcharges – Development surcharge at the rate of 5% will be leviable on haulage charges
8. Procedure for notifying a CRT
a. It will be processed by CCM in consultation with COM and PCE, with the personal approval of GM.
b. It must be ensured that the current inward / outward traffic of the Good shed is not hindered
1. Conditions
a. Operation and handling of conventional trains will be given preference over container trains.
b. All Private Container Operators (PCO) will have access to any container rail terminal on “first come first serve basis.”
c. Use of ground at a container Rail terminal (CRT) will be permitted to only one private container operator at a time
d. No CRT will provide storage facilities.
e. All CRT will function round the clock.
2. PCO will be responsible for security of cargo awaiting loading and removal.
3. Terminal Access Charge:
i. Per rake per terminal- ₹. 132860/-
ii. If both terminals of Railway- ₹. 265920/-
4. Free time for loading/unloading- 09 Hr.
5. Detention charge- ₹.150/- per rake per hour or part thereof, if rake detained after free time.
6. Ground usage Charge:
a) Ground usage charge will be levied for the use of ground at CRT after expiry of free time.
b) Free time and usage charge.
7. Development Surcharges – Development surcharge at the rate of 5% will be leviable on haulage charges
8. Procedure for notifying a CRT
a. It will be processed by CCM in consultation with COM and PCE, with the personal approval of GM.
b. It must be ensured that the current inward / outward traffic of the Good shed is not hindered