ENGINE ON LOAD SCHEME (EOL):
1. Objective:
i. Optimum utilization of rolling stock.
ii. To minimize the detention of wagons.
2. Engine on-load scheme has been implemented for the better utilization of wagons and for quick transportation of goods.
3. During the loading and unloading, the engine will remain in siding so that the train can be run immediately after the completion of these tasks.
4. The owner of the siding will have to choose this scheme and also sign the agreement.
5. All new siding will be brought under the EOL operation while giving 'RTC'.